Investigation DP02007 Opened 2002-08-22 · closed 2002-12-04
FUEL-FED FIRES
THE FARS DATA SHOWS THAT THE RISK OF FIRE FROM IMPACT IN ALL DIRECTIONS IN THE SUBJECT VEHICLES IS THE SAME AS ALL OTHER SEDANS.THE SUBJECT VEHICLES ARE NOT OVER REPRESENTED WITH RESPECT TO THE RISK OF FIRE IN REAL-WORLD HIGH-ENERGY CRASHES.A FURTHER DISCUSSION OF ISSUES RELATED TO POST CRASH FIRES IN THE SUBJECT…
Investigation DP05005 Opened 2005-09-22 · closed 2006-01-04
SPARK PLUG EJECTION FROM CYLINDER HEAD
ON SEPTEMBER 6, 2005, ODI RECEIVED A PETITION REQUESTING THAT THE AGENCY INVESTIGATE ALLEGATIONS OF ENGINE SPARK PLUG EJECTION IN CERTAIN MODEL YEAR 1997 THROUGH 2004 FORD VEHICLES WITH TRITON V-8 AND V-10 ENGINES.ODI RECEIVED A TOTAL OF 474 NON-DUPLICATIVE COMPLAINTS ON THE SUBJECT VEHICLES WHERE THE COMPLAINANT, OR…
Investigation DP05005 Opened 2005-09-22 · closed 2006-01-04
SPARK PLUG EJECTION FROM CYLINDER HEAD
ON SEPTEMBER 6, 2005, ODI RECEIVED A PETITION REQUESTING THAT THE AGENCY INVESTIGATE ALLEGATIONS OF ENGINE SPARK PLUG EJECTION IN CERTAIN MODEL YEAR 1997 THROUGH 2004 FORD VEHICLES WITH TRITON V-8 AND V-10 ENGINES.ODI RECEIVED A TOTAL OF 474 NON-DUPLICATIVE COMPLAINTS ON THE SUBJECT VEHICLES WHERE THE COMPLAINANT, OR…
Investigation DP05005 Opened 2005-09-22 · closed 2006-01-04
SPARK PLUG EJECTION FROM CYLINDER HEAD
ON SEPTEMBER 6, 2005, ODI RECEIVED A PETITION REQUESTING THAT THE AGENCY INVESTIGATE ALLEGATIONS OF ENGINE SPARK PLUG EJECTION IN CERTAIN MODEL YEAR 1997 THROUGH 2004 FORD VEHICLES WITH TRITON V-8 AND V-10 ENGINES.ODI RECEIVED A TOTAL OF 474 NON-DUPLICATIVE COMPLAINTS ON THE SUBJECT VEHICLES WHERE THE COMPLAINANT, OR…
Investigation EA03001 Opened 2003-01-27 · closed 2003-11-19
CNG TANK EXPLOSION
IN SEPTEMBER 2002, A FUEL CYLINDER IN A NATURAL GAS POWERED VEHICLE (NGV) EXPLODED DURING A FIRE.FORD AND VRTC TEST ENGINEERS JOINTLY EXAMINED THE INCIDENT VEHICLE AND REVIEWED TESTING TO DETERMINE WHETHER THE PERFORMANCE OF THE PRESSURE RELIEF VALVE (PRD) WAS PROPER.THE PURPOSE OF A PRD IS TO PROTECT A COMPRESSED…
Investigation PE00043 Opened 2000-10-20 · closed 2001-02-02
REAR AXLE TRAILING ARM FRAME MOUNTING
There is no summary currently available
Investigation PE02071 Opened 2002-10-01 · closed 2003-01-27
CNG TANK EXPLODING IN A FIRE
AN EXPLOSION OF A COMPRESSED NATURAL GAS (CNG) TANK SHOULD NOT BE ABLE TO OCCUR, AS THE TANK IS FITTED WITH A PRESSURE RELIEF DEVICE (PRD). THIS PRD SHOULD RELEASE THE CNG IN THE TANK, PRIOR TO THE PRESSURE REACHING THE TANK BURST PRESSURE.THE PRD DID NOT RELEASE IN THE SUBJECT WISCONSIN POLICE CRUISER…
Investigation PE98041 Opened 1998-07-23 · closed 1998-09-29
FRONT SEAT ANCHOR BOLT FAILURE
THE DRIVER'S SEAT, OF THE SUBJECT SPLIT-SEAT CONFIGURATION, IS SECURED TO THE VEHICLE FLOOR PAN WITH FOUR BOLTS.A SINGLE BOLT IS LOCATED AT BOTH THE FRONT AND REAR OF EACH OF THE TWO SEAT TRACKS.THESE TRACKS ARE LOCATED ON EACH SIDE OF THE SEAT.IF THE OUTBOARD-FORWARD BOLT FAILS, THE SEAT IS RETAINED BY 3 REMAINING…
Investigation PE98057 Opened 1998-10-28 · closed 1999-02-11
INERTIA FUEL SHUT OFF SWITCH
There is no summary currently available
Investigation PE99047 Opened 1999-07-12 · closed 1999-09-23
BLOW BACK DURING REFUELING
There is no summary currently available
Investigation SQ01014 Opened 2001-11-27 · closed 2002-10-03
POST REAR END COLLISION FIRES
There is no summary currently available